Resourceful Manager offering history of success coordinating and monitoring operations across various departments. Effective leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Highly committed with hardworking mentality to maintain quality of services and products.
• Supervised Construction of CYCLOTRON KIUBE.
• Supervising daily basis of Operations of CYCOTRON KIUBE.
• Supervising Installation of 600 Kw On-Grid Solar System.
• Coordinating with architects and engineers to determine best HVAC solution for building.
• Monitoring projects to ensure that they are completed on time and within budget.
• Ensuring correct purchase of electrical material on-site.
• Monitoring electrical equipment on daily basis to avoid any failure.
• Supervising installation of MRI and X-ray machines with vendor.
• Supervising the installation of Busway.
• Preventing wastage and misuse of equipment, materials and tools.
• Supervising Cable Pulling and Cable Termination.
• Supervised the different sites.
• Ensuring about work that all should be done according to drawings.
• Manages directly and provide engineering and technical supports to all electrical work groups at site.
- Construction of High Rise 24 Towers with 2 basements and Ground plus 22 floors.
- Construction of 120 and 240 Sq. yard, 400 Bungalows.
- 200 KW Solar System (Off Grid).
- 120 beds hospital.
• Ensured that all works were done in accordance with approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
• Supervised the installation of Cable Trays and Conduits.
• Supervised the installation of Low Voltage Panel Boards.
• Plans the execution of all electrical related works and coordinated with the works to mechanical.
• Prevented the wastage and misuse of equipment, materials and tool).
• Supervised Cable Pulling and Cable Termination.
• Grounded of all panels and electrical equipment and devices.
• Submitted site daily reports and inspection requests.
• Made weekly plans to achieve better performance.
• Daily reported to Operation Manager.
• Supervised installation of 200 KW Solar System (Off Grid).
• Supervised the crew in the installation of electrical equipment, fixtures and fittings, and lighting).
• Supervised the hospital building, according to medical equipment’s installation.
- Construction of High Rise building with 2 basements and Ground plus 24 floors.
• Followed Approved Drawings and materials according to project Specification and Standards for all electrical system.
• Supervised installation of underground Cabling.
• Supervision of installation of Earthing Protection System.
• Supervision of boundary Lightings.
• Supervised installation of all types of Lighting Panels and Lighting Control Panels.
• Supervised all electrical conduits.
• Supervised all plumbing work.
• Supervision of installation of all types of Lighting + Exhausts fans.
• Attend meetings with suppliers for approval of materials.
• Submitted site daily reports and inspection requests.
• Coordinated with Client / Consultant’s representatives for any site instructions and inspection of works.
Team Leadership
Operations Management
Strategic Planning
Performance Management
CYCLOTRON PROJECT COMPLETION
- Registered Engineer at Pakistan Engineering Council.
- Member at Rotaract Club.
CYCLOTRON PROJECT COMPLETION