Summary
Overview
Work History
Education
Skills
Timeline
Generic

Abdul Hafeez

CEO/Director Projects
Karachi, Sindh

Summary

Results-driven CEO with forward-thinking approach centered on company success and competitive growth. Demonstrated record of success in building successful teams and managing profitable operations.

Extensive experience of Engineering Projects in Oil & Gas Industry;

  • Construction of Bulk Oil Storage Terminals
  • Steel Storage Tanks
  • Pipelines
  • RCC Structures
  • Fire Fighting Network
  • Manufacturer of Folding Stairway for Fuel Loading Operations.

Overview

36
36
years of professional experience

Work History

CEO

Aleem Engineering Co.
Karachi, Sindh
01.2006 - Current
  • Led the Company in achieving sustainable growth through successful accomplishment of Engineering Projects in Oil & Gas Industry.
  • 1996-date: Manufacture and Install Folding Stairway/Swing Ladders for Tanker Fueling Operations in ALL Oil Companies in Pakistan. (1,200 Units to date).
  • 2006-date: CEO
  • · 2024: Manufactured and installed Retractable Folding Stairways for TLs Operations at all Shell Pakistan Terminals, Pakistan Refinery, Attock Refinery.
  • · 2023: Tank Conversion to HSD, including Pipelines at Shell Terminal. MOVs for 16 & 8-inch Tanker Discharge Pipelines.
  • · 2022: Fire Fighting Project for Shell Pakistan, including construction of tank, 2km pipeline network, and construction of pump house.
  • · 2019: TL Loading System. Manufactured and installed retractable folding stairway at Total Parco Terminal, Karachi.
  • · 2018: Overheat Protection System Piping Work for Shell Lubricant Plant.
  • · 2016: Construction of RCC Buildings at Shell Lubricant Plant, Karachi.
  • · 2016: Tanker Discharge Pipeline Replacement, 16-inch and 8-inch diameter, at Shell Karachi Terminal.
  • · 2015: Revitalization of Shell Bulk Oil Storage Daulatpur Depot, including Construction of Fire Water Tank, Oil Storage Tanks, Pipelines, and Fire Fighting Network.
  • · 2014: Installation of Internal Floating Screen in Tanks at various Oil Terminals.
  • · 2014: Tank RT-04 refurbishment at Rawalpindi. CTX-06, CTX-20, and CTX-30 at Keamari Terminal for Total Parco Limited/Chevron.
  • · 2013: Oil Storage 11 Tanks complete revamping at Shell Plant, Karachi.
  • · 2012: Bulk Additive Transfer System - Complete Piping and Electrical Work at Shell Lubricant Plant, Karachi.
  • 2011: Construction of roads, hardstanding, civil structure, and entrance/exit gates for Shell Terminals Machike and LOBP Karachi.
  • · 2010: Jet Fuel Filling Facility Piping work at Shell, Karachi.
  • · 2010: Fall Arrester System for Shell Terminals KMR, SKP, QTA, MCH, and TJB.
  • · 2010: Fire Fighting System at PSO Quetta Terminal.
  • · 2009: Tanks Refurbishment with Product and Foam Piping at Shell Karachi.
  • · 2008: HSD Additive Injection Automation (NEMO 2001) at Shell Pakistan Terminals.
  • · 2007: Construction of RCC Surface Drains for Shell Terminals.
  • · 2006-2008: Complete Maintenance Contract of Shell Terminals.

Project Manager

AEC
Karachi, Sindh
01.1998 - 12.2006
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.

· 1998-2006: COMPLETE MAINTENANCE CONTRACT OF SHELL DEPOTS, INSTALLATIONS, AVIATION TERMINALS – ALL PAKISTAN

· 2006: Hard-standing Railway siding/Tank Wagon Operations, Keamari Terminal, Karachi

· 2006: VISCOSITY MODIFYING UNIT TANK, STEEL STRUCTURAL PLATFORM, PIPING SYSTEM, SHELL LUBRICANT BLENDING PLANT, KEAMARI, KARACHI.

· 2004-05: CONSTRUCTION OF RCC BUILDING FOR HSSE TRAINING, CONSTRUCTION OF RCC DRUMS LOADING PLATFORM & SHED AT SHELL LUBRICANT BLENDING PLANT, KARACHI.

· 2003: FIRE FIGHTING NETWORK – COMPLETE PIPING FOR FOAM & WATER LINES AT SHELL KEAMARI TERMINAL, KARACHI.

· 2003: TLs Decanting Gantry, Shell Shikarpur & Quetta Depots

· 2002: Retail Outlet for Pakistan State Oil and Shell Pakistan, Lahore.

· 2000: Trolley Mounted Calibration Unit for Pakistan State Oil.

· 2000: Construction of Bulk Oil Storage Tank for Pakistan State Oil at Karachi Terminal.

· 1998-99: TANKER DISCHARGE PIPELINE 3km Long 16-inch & 8-inch FROM OIL PIER TO OIL TERMINALS

Site Manager

AEC
Karachi, Sindh
06.1988 - 07.1998
  • Manage site team, ensuring quality workmanship and adherence to project timelines and specifications.

· 1998: Tank Wagon (Rail TW) Gantry Construction for Shell: Steel structural Gantry with Piping Work, Keamari Terminal, Karachi

· 1998: Construction of Tank Truck Calibration Unit at Shell Keamari Terminal, Karachi

· 1996-97: CONSTRUCTION OF 02 STORAGE TANKS SP-20 & 21 WITH COMPLETE PIPING AND CIVIL WORK AT SHELL KEAMARI TERMINAL, KARACHI.

· 1995: CONSTRUCTION OF TANK TRUCK CALIBRATION UNIT Pakistan State Oil Co. KEAMARI TERMINAL, KARACHI.

· 1994-95: Maintenance Contract for Tanks & Pipelines Pakistan State Oil Co. Keamari, Karachi

· 1994-95: Tank Lorry Filling Facility Gantry NDP Shell Keamari, Karachi

· 1993-94: COMPLETE TERMINAL PRODUCT PIPING AT PAKISTAN STATE OIL CO. SIHALA, ISLAMABAD

· 1993: CONSTRUCTION OF BULK OIL STORAGE DEPOT (CIVIL WORK –OFFICE BUILDING, LUBRICANT GODOWN, PUMP HOUSE, TANKS DYKE WALL) SHELL QUETTA

· 1991-92: Construction of Lubricant Godown TLs Decanting System, Fire Fighting System, Shell Badamibagh Depot, Lahore

· 1988-90: CONSTRUCTION OF BULK OIL STORAGE DEPOT AT SHELL TARUJABBA INCLUDING STORAGE TANKS, PIPELINES, GANTRIES, OFFICE BLOCK, PUMP HOUSES, ROADS & HARDSTANDING, ELECTRICAL WORK

Education

MBA -

CBM
Karachi
04.2001 -

BS Civil -

University of Karachi
Karachi
04.2001 -

Skills

Effective Decision Making

Strategic Visioning

Problem-Solving

Planning and coordination

Management Team Leadership

Business Development

Timeline

CEO

Aleem Engineering Co.
01.2006 - Current

MBA -

CBM
04.2001 -

BS Civil -

University of Karachi
04.2001 -

Project Manager

AEC
01.1998 - 12.2006

Site Manager

AEC
06.1988 - 07.1998
Abdul HafeezCEO/Director Projects